infrastructure

Modeling Integrated Bioenergy Supply Chain Systems Under Uncertainty

  • Principal Investigator Yuanzhe Li
  • University of California, Davis
This dissertation develops an integrated modeling framework for advanced biofuel production system from dedicated energy crops under uncertainty. The goal of this framework is to support strategic infrastructure development and policy making for bioenergy production systems.
Project Status
Complete

Modeling the Impact of Road Grade on Driving Behavior, Vehicle Energy Consumption, and Emissions

  • Principal Investigator Haobing Liu, Ph.D.
  • Georgia Institute of Technology
This study addresses two issues: 1) how road grade impacts vehicle speed and acceleration distributions, and how such distributions vary across vehicle types, roadway types, traffic conditions, etc.; and 2) how significant the impact of integrating grade interactions is with respect to energy, emissions, and air quality modeling.
Project Status
Complete

Monitoring Sea Level Rise at the Local and Regional Scale

Research Product Type
Policy Brief
This policy brief summarizes findings from a project which utilized a method to monitor shoreline and infrastructure changes in response to sea level rise using a network of time-lapse cameras.

Performance Assessment of Asphalt Mixes Containing Reclaimed Asphalt Pavement and Tire Rubber

Research Product Type
Dissertation / Thesis
The primary objective of this dissertation is to improve the current laboratory testing technologies and performance assessment approaches for characterizing the performance-related properties of asphalt mixes containing recycled materials and to improve understanding of how these properties affect the performance of asphalt pavements so that they can be designed and constructed better.

Permeable Pavement Road Map Workshop 2017

  • Principal Investigator John Harvey, Ph.D.
  • University of California, Davis
This project identified knowledge gaps and other barriers to wider implementation of permeable pavements. It involved a workshop that discussed plans for improved pavement policy.
Project Status
Complete